Project cargo starts with a route study
Oversized freight fails on the details: a bridge weight limit, a crane radius, a permit that only covers daylight hours. We survey the route first, then choose the equipment and the mode around the constraints that survey found.
Flat racks, breakbulk and heavy-haulage trailers each need different documentation. We assemble the lifting plan, the stowage plan and the permit pack as one submission so nothing is approved separately and out of sequence.
- Route surveys and bridge assessments
- Flat rack, breakbulk and heavy haulage
- Lifting and stowage plans
- Abnormal load permits arranged
Comprehensive logistics service support
Survey, permits, lifting supervision, lashing certificates and customs formalities are coordinated as one scope. For multi-leg moves we nominate the transfer point and confirm the equipment is available on the day, not on request.
Project cargo is rarely late because of the sailing. It is late because a permit was filed in the wrong order. We file in sequence.
Moving something oversized?
Send dimensions, weight and the origin gate. We will come back with a route and a survey scope.