How rail freight drives global trade
Rail carries a large share of inland freight without most shippers ever specifying it. The container that leaves a port by train and arrives at a distribution depot two thousand kilometres inland is often part of a sea booking, not a rail one.
Why rail competes on long inland legs
Beyond roughly six hundred kilometres, a train's cost per tonne-kilometre flattens out while a truck's keeps climbing. Rail is also less exposed to driver hours and fuel volatility, which makes budgeting more stable across a season.
The trade-off is granularity. A train leaves when it is formed, not when your pallet is ready, so the collection window has to be planned further ahead than a road move.
Intermodal in practice
- Road leg to the inland terminal, booked to the train's cut-off.
- Wagon allocation confirmed against the block-train plan.
- Border transit declarations prepared before departure.
- Final road leg from the destination terminal to the consignee.
The cut-off is the service
Because a train cannot wait, the whole operation is built backwards from departure. We plan collection a day earlier than the terminal technically requires, on the assumption that something will need that day.
Rail is not slower than road. It is less forgiving of a late collection.
For shippers with steady inland volume, that discipline is a feature: the schedule stops drifting, and the cost becomes predictable enough to plan a quarter ahead.